Deerhurst Resort

HOTEL & CONDO RENOVATION

A large-scale resort renovation delivered through carefully phased construction and full-time on-site coordination within an active hospitality environment.

Deerhurst Resort Case Study
Deerhurst Resort Muskoka logo
Black and white line drawing of a cityscape with several tall buildings.

TYPE

Construction Management

A white dollar sign inside a white circle on a black background.

VALUE

$5 million

Icon of a 3D cube with arrows indicating 3D measurement along x, y, and z axes.

SIZE

125,000 SF

Line drawing of a pencil with a rectangular eraser on a black background.

DESIGNER

Smith Architect Inc. & The Design Agency

Outlined white star on a black background.

COOL FEATURES

Vaulted Stone Fireplace

Icon of mountain with a flag on top, symbolizing achievement or reaching a goal.

THE CHALLENGE

Managing an intricate and phased renovation out of town, in a fully operational resort community.

Icon of a light bulb with rays emitting from it on a dark green circular background.

THE SOLUTION

Through our Construction Management program, Deerhurst converted an aged hotel into updated and modern condo suites. Maintaining the resort’s operations, this project was carefully phased with a rotating schedule for each of the 100 suites. CLI set up a local site office and stationed our project team full-time on the property.

Icon of a checkered flag on a green circular background, symbolizing racing or completion.

THE CONCLUSION

Wallcoverings, hardwood floors, stonework, fireplaces, vaulted ceilings, custom lighting, millwork pieces and furniture move management were orchestrated seamlessly, with little disruption to the resort patrons.

Ready to improve your
workplace?

Let’s create a space that works for your team, your clients, and your business.