HIGH SECURITY PHASED & OCCUPIED BUILD OUT

A phased office reconstruction delivered within an active, high-security environment through expedited scheduling and proactive coordination.

General Construction
SecureKey logo
Line drawing of several high-rise buildings with windows, representing a cityscape.

TYPE

General
Construction

White dollar sign within a circle on a black background.

VALUE

$950,000

Icon of a 3D cube with axes indicating three-dimensional space.

SIZE

12,000 SF

White pencil icon on a black background.

DESIGNER

Freeman & Freeman Design

Outline of a five-pointed star with a black fill and white border on a black background.

COOL FEATURES

Open Plenum |
Raised Floor

Icon of a mountain with a flag at the summit, representing outdoor adventure or achievement.

THE CHALLENGE

Demolishing and reconstructing while the client remained occupied and operational.

Green circular icon with a white light bulb symbol and radiating lines.

THE SOLUTION

The design included a phased solid hoarding plan due to heightened security requirements. The phases were shortened, however included long lead items and an added open plenum requirement.

CLI expedited construction in each phase, reducing the client’s swing time, so new workstation cubes could be installed and occupied as quickly as possible.

Green circular icon with a white checkered flag.

THE CONCLUSION

The construction was completed, incorporating a higher-than-typical number of client-driven changes, while maintaining strict security parameters.